★ ★ ★ Lavon's Second-Loudest Voice First Edition Peeled Fresh When the Bananas Are Ripe

The Lavon Banana. The best thing since sliced banana bread. Build Absolutely Nothing Anywhere Near Anyone. All the news that's fit to peel.

Vol. 1  ·  Iss. 1 Lavon, Texas  ·  Friday, August 15, 2026 Price: 50¢ or one (1) banana

Front Page

Town Will Spend Ninety Days Not Doing What It Was Already Not Doing

The moratorium takes effect in November and expires in February, by which point the thing will still not have started, and can resume not starting.

An auctioneer addressing empty chairs in an empty field.

PICTURED: Public interest in the parcel, at its recorded peak.

Lavon, TX — A ninety-day moratorium on data center development takes effect in November and lifts in February, pausing a project that has no buyer, no application, and no start date.

The pause is intended to give the town time to study the question. The question has been studied without interruption since December of 2024 by several hundred people, none of whom have moved an inch.

Supporters call the delay unnecessary. Opponents call it necessary. Both call it a delay, which remains the only agreement reached in two years.

Anything filed before mid-November proceeds normally. Anything filed after mid-November waits until February and then proceeds normally. Nothing has been filed.

At press time the parcel remained a field. Two years of debate have not changed that, and ninety more days are not expected to either.

December 2024
An empty field.
This Week
The same empty field, unchanged.

THE PARCEL BEFORE AND AFTER TWO YEARS OF PUBLIC DEBATE.


Preservation

Townsfolk holding a vigil before three identical new houses.

Residents Vow to Protect the Small-Town Charm of a Subdivision That Broke Ground in 2023

The charm is enforced by a homeowners association that formed in March and has already ruled twice on mailbox colors. Residents describe the subdivision as the way things used to be, and can name the year exactly: 2023.

Around Town

A storefront being renovated, demolished and left alone at once.

Main Street Building Is Being Renovated, Demolished, and Left Exactly as It Is, Internet Confirms

Three neighbors were asked and three answers were given, each delivered with total confidence and each described as final.

Civic Life

Five separate committees holding almost identical banners, each with a slightly different group name.

Town Now Has More Protest Groups Than the Meeting Room Has Seats

All but one of them refuses to discuss its position with any of the others. The remaining group has offered to mediate and cannot get anyone to take the call.


Artist's Rendering

The Proposed Facility, as Described at the Meeting

An enormous brick hall with far too many smokestacks.

Drawn entirely from public comment. The artist has not seen a data center, and neither has anyone else.


By Order of This Newspaper

Wanted

For Posting Without Permission

Affixing Notices to Every Available Surface in the City Limits

Engraved portrait of the subject. Alias · The Stapler
OccupationStapling
Wanted ForFour Hundred Postings
RewardOne (1) Banana

Approach with tape. She will assume you are helping.


The Banana Stand

Classifieds, sundries & gently used convictions
Back Page · Paid Advertisement
A weathered NO DATA CENTERS IN LAVON yard sign.
Lot No. 01As-Is · Final Sale

Gently Used Anti-Data-Center Yard Sign

Lightly weathered, one (1) previous crusade. Recovered from a median on 78, where it had been quietly blocking the view of oncoming traffic. Still legible, still certain, still not in anybody's yard.

$19.99 or best causeFinal Sale
Lot No. 02Curb Alert

Free PVC Pipe, Roadside

Sixteen feet of schedule 40, leaning against a mailbox since Tuesday. No questions asked and none answered. If it is still there tomorrow it is yours, and if it is gone, that is also correct.

FreeYou Haul
Lot No. 03Just Add Name

Pre-Written Heartfelt Email

Four paragraphs of your own deeply held convictions, written by somebody else and ready to paste. Includes the bracketed [YOUR NAME HERE], which a great many senders have chosen to leave in.

FreeSend to All
Lot No. 04Pump No. 4

Gourmet Gas Station Cheeseburger

Ordered at a counter between the motor oil and the fountain drinks, from a man who will not explain the sauce. Nobody can account for it, everybody eats there, and the line is out the door by eleven.

$8.49Cash Preferred
Lot No. 05Does Not Run

Brisket From the Roadside Truck

Smoked on the shoulder of the highway, out of a vehicle that has not moved under its own power in four years. Sells out by one. Has never once been towed, out of respect.

$16 / lbUntil Gone
Lot No. 06Redeem Elsewhere

Ice Cream Gift Card

Valid at every Braum's except the one Lavon does not have. Includes a full tank of gas, turn-by-turn directions, and twenty quiet minutes to think about the third McDonald's.

$25Drive to Wylie
Lot No. 07Zoned & Waiting

Seventy-Nine Acres, Motivated Seller

Flat, rectangular, and cleared for a building eighty-five feet tall. Two years on the market with no offers. Owner will consider any price, any use, and increasingly, any person.

Make an OfferPlease
Lot No. 08$1.5 Million Off

Municipal Incentive Coupon

One and a half million dollars off, redeemable exclusively by the largest retailer on earth. Never expires. Cannot be combined with a sidewalk, a left-turn lane, or an ice cream shop.

Funded by YouOn the Agenda
Lot No. 09Eleven Fingers

AI-Generated Rally Poster

A stirring call to action, rendered in nine seconds by the exact technology it is protesting. Depicts eleven-fingered neighbors assembled in front of a building that is not a building.

$4Prompt Included
Lot No. 10Fully Briefed

Board-Certified Expert, One Meeting

Attended a single meeting in March and now holds total command of zoning, water law, and the electrical grid. Will explain all three to you in a parking lot for as long as you remain standing in it.

Free, UnfortunatelyCannot Be Stopped
Lot No. 11Genuine Article

The Only Real Thing on This Page

Everything above this line is a joke. This one takes a card. Shirts, stickers, a hat and a mug, printed and shipped by people who have never sat at the 205 light.

Priced in actual dollarsVisit the Merch Shop

The Banana Stand ships nowhere and stocks nothing, Lot No. 11 excepted. Please do not mail us money, and under no circumstances mail us bananas.


Puzzles & Diversions

For the long wait at the 205 light
Back Page

The Banana Crossword

No. 1 · Difficulty: Unanimous

123
4
5
6
7
8
9
1011
12
1314
15

Word Search

Words may appear forwards, backwards, diagonally, or in closed session.

GNINOZMZNSCHZD
DLXYMEYARSHSBQ
JHLUOMHNOFAHRV
GYYNREAAENLBAI
SPNAARQNVXKOUG
YELNTGJAPGBXMN
ARAIOEABEROBSI
WSLMRNCKFEARTT
HCMOICRCRTRIKE
TABUUYEAXADSEL
ALPSMCSBPIGKIX
PEOFUGVTALAEPP
TLEFTRAEHNDTVL
PNOVALMSHRUBSY

Drag across a word, or click its first and last letter

  • ACRES
  • BANANA
  • BRAUMS
  • BRISKET
  • CHALKBOARD
  • EMERGENCY
  • HEARTFELT
  • HYPERSCALE
  • IGNITE
  • LAVON
  • MORATORIUM
  • PATHWAYS
  • PERMIT
  • RETAIL
  • SETBACK
  • SHRUBS
  • UNANIMOUS
  • ZONING

One word on this list does not appear in the grid. It has not filed yet.

Last Week's Solution

There was no last week.

Crossword Clues

Across

  1. Seventy-nine of them, motivated seller (5)
  2. Code name for a prospect that led nowhere (8)
  3. Accepted here in place of fifty cents (6)
  4. What begins in November, on nothing (10)
  5. Fifteen feet of them, hiding eighty-five feet of building (6)
  6. Town in search of a data center investor (5)
  7. Prospect that stopped answering (6)

Down

  1. ___ 27, discussed at length in closed session (10)
  2. What a data center becomes once it stops calling back (6)
  3. How the council voted, and later how it voted the other way (9)
  4. Ice cream chain petitioned for since 2015 (no apostrophe) (6)
  5. How all one hundred identical letters were described (9)
  6. Type of meeting held four times about nothing (9)
  7. Required distance from a property line, or the last two years (7)
  8. What was changed in December of 2024 (6)
  9. Permits filed to date (4)

Five Acres

Five letters. Six tries. No survey required.

right spot wrong spot not in the word

The answer is not COMING SOON. That is two words.


Subscriptions

Have It Delivered

Leave an address and we will send word when the next issue is out. We do not sell addresses. We already tried and nobody wanted them.

The Tip Line

Report the News

Seen something that deserves this level of coverage? Send it in. We read everything and print almost none of it, which is what makes it a newspaper. Bonus points if you point out the irony.

All tips are anonymous either way. This checkbox does nothing. It was placed here purely to make you feel better.

Corrections & Clarifications

In our first edition we described the data center as "the boogeyman." It has since been noted that the boogeyman has, on balance, filed more permits.

We reported that the city is fighting a data center. The city is fighting a data center it is also selling. We regret the simplification.

We referred to the proposed facility as "coming soon." Nothing in Lavon is coming soon. We regret the optimism.

A story last week described Highway 78 as a "highway."

All the news that's fit to peel. The Lavon Banana is an independent publication and is not affiliated with, endorsed by, or authorized by the City of Lavon, any advocacy group, any candidate, or any campaign.

© The Lavon Banana  ·  Printed on 100% Recycled Outrage